SATARTIA ROAD over LAKE GEORGE
SEC 10 T11N R 5W B · County 163, Mississippi · Built 1963 · 2 Lanes · 570 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.815333, -90.693233
This bridge is in worse condition than 57.1% of bridges in County 163. The average bridge in Mississippi is 0 years old; this one is 63 years old.
Nearby Bridges
SATARTIA ROAD over CANAL
Built 1975
CAMPBELLVILLE ROAD over SUNFLOWER RIVER CUTOFF
Built 1965
GOODWIN ROAD over DRANAGE CANAL
Built 1993
OLD HIGHWAY 16 over SUNFLOWER RIVER
Built 1977
PHILLIPS ROAD over SILVER CREEK
Built 2015
800 CROSSING ROAD over PANTHER CREEK
Built 1995
BOWIE ROAD over DRAINAGE CANAL
Built 1996
SATARTIA ROAD over SILVER CREEK
Built 1975
SATARTIA ROAD over RELIEF
Built 1996
SATARTIA ROAD over YAZOO RIVER CUT OFF
Built 1959
Bridge Details
- Structure #
- SA8200000000127
- Year Built
- 1963
- Length
- 185.3 m (607.9 ft)
- Max Span
- 9.4 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 570
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,216,000
- Total Project Cost
- $1,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.