GRAND OAK RD over DRAINAGE CANAL
SEC 18 T12N R 4W · County 163, Mississippi · Built 1975 · 2 Lanes · 80 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
32.886794, -90.649108
This bridge is in worse condition than 57.1% of bridges in County 163. The average bridge in Mississippi is 0 years old; this one is 51 years old.
Nearby Bridges
WOODARD ROAD over DRAINAGE CANAL
Built 1978
COLBY ROAD over DRAINAGE CANAL
Built 2006
NICKELSON ROAD over DRAINAGE CANAL
Built 2024
ANGUILLA RD over DRAINAGE CANAL
Built 1990
800 CROSSING ROAD over PANTHER CREEK
Built 1995
PHILLIPS ROAD over SILVER CREEK
Built 2015
DOWLING ROAD over MCCANN BAYOU
Built 2011
BOWIE ROAD over DRAINAGE CANAL
Built 1996
DEEP BAYOU ROAD over DEEP BAYOU
Built 1995
160 CROSSING ROAD over PANTHER CREEK
Built 1991
Bridge Details
- Structure #
- SA8200000000178
- Year Built
- 1975
- Length
- 23.2 m (76.1 ft)
- Max Span
- 5.8 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $169,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.