OSYKA PROGRESS RD. over RELIEF BALA CHITTO RIV

SEC 21 T 1N R 8E B · County 113, Mississippi · Built 1991 · 2 Lanes · 610 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
SA5700000000030
Year Built
1991
Length
47.2 m (154.9 ft)
Max Span
9.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
610
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$580,000
Total Project Cost
$1,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.