OSYKA PROGRESS RD. over RELIEF TANGIPAHOA RIVER

SEC 36 T 1N R 7E B · County 113, Mississippi · Built 2001 · 2 Lanes · 1,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA5700000000019
Year Built
2001
Length
52.1 m (170.9 ft)
Max Span
5.8 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$795,000
Total Project Cost
$1,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.