PIKE ROAD 93 S. over FOREST BRANCH
SEC 17 T 1N R 8E B · County 113, Mississippi · Built 2007 · 2 Lanes · 390 vehicles/day
Overall
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
31.054528, -90.415375
This bridge is in worse condition than 30.8% of bridges in County 113. The average bridge in Mississippi is 0 years old; this one is 19 years old.
Nearby Bridges
GLADHURST ROAD over BALA CHITTO CREEK
Built 1998
OSYKA PROGRESS RD. over RELIEF BALA CHITTO RIV
Built 1991
OSYKA PROGRESS RD. over BALA CHITTO CREEK
Built 1991
FOXCHASE ROAD over MCNAB CREEK
Built 2019
OLD 51 SOUTH over SMALL DRAIN
Built 2013
OLD 51 SOUTH over LARGE CREEK
Built 2013
EMERALD-STATELINE over SMALL DRAIN
Built 2007
MAGNOLIA-PROGRESS over BALA CHITTO CREEK
Built 1979
EMERALD-STATELINE over LARGE DRAIN
Built 2011
ST. MARY ROAD over TANGIPAHOA RIVER
Built 2013
Bridge Details
- Structure #
- SA5700000000029
- Year Built
- 2007
- Length
- 36.7 m (120.4 ft)
- Max Span
- 12.2 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 390
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $434,000
- Total Project Cost
- $782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.