T 124 over N FK WATONWAN RIVER
2.2 MI N OF JCT TH 30 · County 033, Minnesota · Built 1975 · 2 Lanes · 21 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
44.082833, -94.899892
This bridge is in worse condition than 81.3% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 51 years old.
Nearby Bridges
T 124 over CO DITCH # 39
Built 1980
CSAH 1 over N FK WATONWAN RIVER
Built 1939
CSAH 8 over N FK WATONWAN RIVER
Built 1964
CSAH 17 over STREAM
Built 1992
T 152 over N FK WATONWAN RIVER
Built 2007
T 125 over N FK WATONWAN RIVER
Built 2004
CSAH 4 over N FK WATONWAN RIVER
Built 2012
T 124 over STREAM
Built 1979
MN 30 over BR OF WATONWAN R
Built 2010
CR 29 over N FK WATONWAN RIVER
Built 1962
Bridge Details
- Structure #
- R0031
- Year Built
- 1975
- Length
- 8.8 m (28.9 ft)
- Max Span
- 4.3 m
- Lanes
- 2
- Daily Traffic
- 21
- Material
- Steel
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $350,000,000
- Total Project Cost
- $370,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.