T 125 over N FK WATONWAN RIVER

1.6 MI N OF JCT TH 30 · County 033, Minnesota · Built 2004 · 2 Lanes · 45 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
17J22
Year Built
2004
Length
13.1 m (43 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
45
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$126,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.