CSAH 1 over N FK WATONWAN RIVER
2.0 MI N OF JCT TH 30 · County 033, Minnesota · Built 1939 · 2 Lanes · 522 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
44.0786, -94.919892
This bridge is in worse condition than 66% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 87 years old.
Nearby Bridges
T 124 over N FK WATONWAN RIVER
Built 1975
T 125 over N FK WATONWAN RIVER
Built 2004
T 124 over CO DITCH # 39
Built 1980
CSAH 8 over N FK WATONWAN RIVER
Built 1964
MN 30 over BR OF WATONWAN R
Built 2010
CR 29 over N FK WATONWAN RIVER
Built 1962
CSAH 17 over STREAM
Built 1992
T 152 over N FK WATONWAN RIVER
Built 2007
T 124 over STREAM
Built 1979
CR 99 over N FK WATONWAN RIVER
Built 1968
Bridge Details
- Structure #
- 89502
- Year Built
- 1939
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 522
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $143,000,000
- Total Project Cost
- $79,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.