M 714 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1914 · 1 Lanes · 986 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L8907
Year Built
1914
Length
32.3 m (106 ft)
Max Span
13.7 m
Width
14.9 m (48.9 ft)
Lanes
1
Daily Traffic
986
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$514,000,000
Total Project Cost
$481,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.