M 708 over MIDTOWN GREENWAY
0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1913 · 2 Lanes · 1,074 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.950267, -93.289383
This bridge is in worse condition than 71.1% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 113 years old.
Nearby Bridges
M 706 over MIDTOWN GREENWAY
Built 1913
CSAH 22 over HCRRA
Built 1987
M 700 over MIDTOWN GREENWAY
Built 1913
M 2013 over MIDTOWN GREENWAY
Built 1991
MSAS 170 over MIDTOWN GREENWAY
Built 1987
M 2010 over MIDTOWN GREENWAY
Built 1914
MSAS 172 over MIDTOWN GREENWAY
Built 1986
M 714 over MIDTOWN GREENWAY
Built 1914
M 2416 over MIDTOWN GREENWAY
Built 2020
M 718 over MIDTOWN GREENWAY
Built 1913
Bridge Details
- Structure #
- L8904
- Year Built
- 1913
- Length
- 28.8 m (94.5 ft)
- Max Span
- 9.6 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,074
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $458,000,000
- Total Project Cost
- $369,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.