M 2416 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 2020 · 2 Lanes · 2,800 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
27J72
Year Built
2020
Length
23.2 m (76.1 ft)
Max Span
12.6 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.