CR 69 over BIG COTTONWOOD RIVER
2.0 MI SE OF JCT TH 59 · County 083, Minnesota · Built 1959 · 2 Lanes · 36 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
44.283108, -95.718411
This bridge is in worse condition than 98.3% of bridges in County 083. The average bridge in Minnesota is 0 years old; this one is 67 years old.
Nearby Bridges
T 27 over COTTONWOOD RIVER
Built 1978
T 30 over COTTONWOOD RIVER
Built 1978
T 57 over COTTONWOOD RIVER
Built 2008
T 340 over BIG COTTONWOOD RIVER
Built 2008
CSAH 9 over COTTONWOOD RIVER
Built 2010
US 59 over COTTONWOOD RIVER
Built 1941
T 21 over BIG COTTONWOOD RIVER
Built 1974
CSAH 2 over Cottonwood River
Built 2002
T 26 over BIG COTTONWOOD RIVER
Built 1925
CR 67 over COTTONWOOD RIVER
Built 1996
Bridge Details
- Structure #
- L1775
- Year Built
- 1959
- Length
- 16.7 m (54.8 ft)
- Max Span
- 5.5 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 36
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $400,000,000
- Total Project Cost
- $450,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.