T 27 over COTTONWOOD RIVER

1.9 MI E OF JCT TH 59 · County 083, Minnesota · Built 1978 · 2 Lanes · 21 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
42531
Year Built
1978
Length
25.4 m (83.3 ft)
Max Span
8.5 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
21
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.