T 57 over COTTONWOOD RIVER

0.7 MI E JCT US 59 · County 083, Minnesota · Built 2008 · 2 Lanes · 30 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
42J25
Year Built
2008
Length
13.9 m (45.6 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.