MN 5 over MISS RIVER; CITY ST

2.1 MI SW OF JCT TH 51 · County 123, Minnesota · Built 1961 · 4 Lanes · 47,520 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
9300
Year Built
1961
Reconstructed
2016
Length
364.2 m (1194.9 ft)
Max Span
91.4 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
47,520
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.