MN 62 over TH 5 EB off ramp

0.1 MI NW OF JCT TH 5 · County 053, Minnesota · Built 1992 · 2 Lanes · 31,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27108
Year Built
1992
Length
51.8 m (169.9 ft)
Max Span
23.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
31,805
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.