CON 5876 over TH 5 WB ON RAMP

AT JCT TH 5; 55 · County 053, Minnesota · Built 1968 · 2 Lanes · 9,943 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27161
Year Built
1968
Reconstructed
2020
Length
61.2 m (200.8 ft)
Max Span
24.4 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
9,943
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.