MN 19 over REDWOOD RIVER

0.1 MI SW OF JCT 59 · County 083, Minnesota · Built 1975 · 4 Lanes · 8,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
91352
Year Built
1975
Length
14.4 m (47.2 ft)
Max Span
4.4 m
Lanes
4
Daily Traffic
8,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.