MN 19 over REDWOOD RIVER

0.7 MI SW OF MARSHALL · County 083, Minnesota · Built 1932 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5151
Year Built
1932
Length
31.1 m (102 ft)
Max Span
9.4 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
2,900
Material
Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000,000
Total Project Cost
$351,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.