MN 19 over REDWOOD RIVER

0.2 MI NE OF JCT TH 59 · County 083, Minnesota · Built 1931 · 3 Lanes · 8,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5083
Year Built
1931
Length
33 m (108.3 ft)
Max Span
11.4 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
8,800
Material
Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$795,000,000
Total Project Cost
$438,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.