T 289 over TRIB REDWOOD RIVER

1.4 MI W OF JCT CSAH 18 · County 117, Minnesota · Built 2021 · 2 Lanes · 89 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
59K42
Year Built
2021
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
89
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.