T 288 over REDWOOD RIVER

1.6 MI E OF JCT TH 23 · County 117, Minnesota · Built 1941 · 2 Lanes · 75 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
L3679
Year Built
1941
Length
6.9 m (22.6 ft)
Max Span
3 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000,000
Total Project Cost
$320,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.