T 302 over TRIB REDWOOD RIVER

1.9 MI E OF JCT TH 23 · County 117, Minnesota · Built 2022 · 2 Lanes · 96 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
59K44
Year Built
2022
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
96
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.