CON 2918 over TH 100 NB on ramp

0.4 MI S OF JCT TH 100 · County 053, Minnesota · Built 1989 · 1 Lanes · 14,543 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
27788
Year Built
1989
Length
88 m (288.7 ft)
Max Span
43.3 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
14,543
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$827,000,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.