CON 6478 over I 394 I 394R

AT THE JCT TH 100; 394 · County 053, Minnesota · Built 1989 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
27752A
Year Built
1989
Length
98.8 m (324.1 ft)
Max Span
49.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.