CON 5129 over TH 100 SB

AT THE JCT TH 394; 100 · County 053, Minnesota · Built 1989 · 1 Lanes · 392 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
27751A
Year Built
1989
Length
54.6 m (179.1 ft)
Max Span
35.2 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
392
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$585,000,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.