I 35 over 185th ST W (CSAH 60)

4.0 MI S OF JCT 3 · County 037, Minnesota · Built 2004 · 3 Lanes · 32,786 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

44.681372, -93.293236

This bridge is in worse condition than 34.6% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
19904
Year Built
2004
Length
59.9 m (196.5 ft)
Max Span
32.9 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
32,786
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.