I 35 over 185th ST W(CSAH 60)

4.0 MI S OF JCT TH 3 · County 037, Minnesota · Built 2004 · 2 Lanes · 35,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

44.681294, -93.293608

This bridge is in worse condition than 34.6% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
19903
Year Built
2004
Length
59.9 m (196.5 ft)
Max Span
32.9 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
35,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$970,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.