I 35 over LAKE MARION

4.6 MI S OF JCT TH 35 E · County 037, Minnesota · Built 1965 · 2 Lanes · 32,786 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

44.672931, -93.293872

This bridge is in worse condition than 47.9% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
19848
Year Built
1965
Length
23.2 m (76.1 ft)
Max Span
7.7 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
32,786
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$499,000,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.