I-75 over CONRAIL RR

IN DETROIT · County 163, Michigan · Built 1969 · 10 Lanes · 152,325 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000011838
Year Built
1969
Reconstructed
2003
Length
67.1 m (220.1 ft)
Max Span
18.5 m
Width
52.9 m (173.6 ft)
Lanes
10
Daily Traffic
152,325
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.