I-75 over MCNICHOLS RD

IN DETROIT OVER MCNICHOLS · County 163, Michigan · Built 1969 · 8 Lanes · 152,325 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
000000000011858
Year Built
1969
Reconstructed
2003
Length
68.5 m (224.7 ft)
Max Span
25 m
Width
45.5 m (149.3 ft)
Lanes
8
Daily Traffic
152,325
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.