I-75 over RAMP TO DAVISON(M-8)

IN DETROIT OVER RAMP C TO · County 163, Michigan · Built 1969 · 8 Lanes · 166,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011864
Year Built
1969
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
45.1 m (148 ft)
Lanes
8
Daily Traffic
166,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.