I-75 SB over RED RUN DRAIN PATH

IN MADISON HTS · County 125, Michigan · Built 2023 · 4 Lanes · 78,894 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000008042
Year Built
2023
Length
68.6 m (225.1 ft)
Max Span
68 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
78,894
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.