I-75 NB over RED RUN DRAIN PATH
IN MADISON HTS · County 125, Michigan · Built 2022 · 5 Lanes · 78,894 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.506506, -83.114753
This bridge is in worse condition than 34.3% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 4 years old.
Nearby Bridges
I-75 SB over RED RUN DRAIN PATH
Built 2023
I-75 SB OFF RAMP over RED RUN DRAIN PATH
Built 2022
I-75 NB over 12 MILE RD
Built 2022
I-75 SB over 12 MILE RD
Built 2023
GARDENIA RD over I-75
Built 2022
I-75 SB over 13 MILE RD
Built 2021
I-75 NB over 13 MILE RD
Built 2022
11 MI RD over I-75
Built 2021
10.5 MI ROAD over I-75
Built 2022
I-696W TO I-75N over I-75N TO 11 MI EXIT RMP
Built 2022
Bridge Details
- Structure #
- 000000000008041
- Year Built
- 2022
- Length
- 68.6 m (225.1 ft)
- Max Span
- 68 m
- Width
- 29.8 m (97.8 ft)
- Lanes
- 5
- Daily Traffic
- 78,894
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.