I-696W TO I-75N over I-75N TO 11 MI EXIT RMP

N OF I-696 AND I-75 INTCH · County 125, Michigan · Built 2022 · 1 Lanes · 32,484 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000013544
Year Built
2022
Length
112.8 m (370.1 ft)
Max Span
55.6 m
Width
13 m (42.7 ft)
Lanes
1
Daily Traffic
32,484
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.