I 495 NB over ST225 CONCORD RD

MM 81.7 OF 495 NB · County 017, Massachusetts · Built 1959 · 3 Lanes · 56,013 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W2601827TDOTNBI
Year Built
1959
Length
42.1 m (138.1 ft)
Max Span
17.1 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
56,013
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,144,000
Total Project Cost
$3,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.