I 495 SB over ST225 CONCORD RD

@MM 81.7 · County 017, Massachusetts · Built 1959 · 3 Lanes · 59,452 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W2601827RDOTNBI
Year Built
1959
Length
39 m (128 ft)
Max Span
17.1 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
59,452
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,995,000
Total Project Cost
$2,993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.