HWY RUSSELL ST over I 495

@MM 79.7 0.5 MI NE OF 2A · County 017, Massachusetts · Built 1960 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L13028297DOTNBI
Year Built
1960
Length
84.1 m (275.9 ft)
Max Span
23.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,119,000
Total Project Cost
$10,679,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.