ST 2 A/ST110/KING over I 495

1.5 MI N OF RT 2 · County 017, Massachusetts · Built 1960 · 3 Lanes · 3,845 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L1302626MDOTNBI
Year Built
1960
Reconstructed
2013
Length
87.5 m (287.1 ft)
Max Span
24.2 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
3,845
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,062,000
Total Project Cost
$10,594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.