I 495 over WATER MILL POND

@MM 78.7 1.25 MI NE RT 2 · County 017, Massachusetts · Built 1961 · 6 Lanes · 116,909 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
L130251UWDOTNBI
Year Built
1961
Reconstructed
1975
Length
10.7 m (35.1 ft)
Max Span
4.9 m
Lanes
6
Daily Traffic
116,909
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$166,000
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.