I 90 WB over RR MBTA/CSX

.3MI.EAST I495 L4 · County 027, Massachusetts · Built 1957 · 3 Lanes · 61,456 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W240274NGDOTNBI
Year Built
1957
Reconstructed
1986
Length
70.9 m (232.6 ft)
Max Span
26.2 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
61,456
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,005,000
Total Project Cost
$13,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.