I 495 NB over I 90

MM 106.4 · County 017, Massachusetts · Built 1965 · 3 Lanes · 48,021 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
H230081UVDOTNBI
Year Built
1965
Length
65.5 m (214.9 ft)
Max Span
21 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
48,021
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,355,000
Total Project Cost
$20,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.