I 90 EB over RR MBTA/CSX

.3 MI E OF I-495 · County 027, Massachusetts · Built 1957 · 3 Lanes · 35,483 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
W240274NFDOTNBI
Year Built
1957
Reconstructed
1986
Length
71.3 m (233.9 ft)
Max Span
26.2 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
35,483
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,265,000
Total Project Cost
$12,398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.