HWY MAYNARD ST over WATER ASSABET RIVER

.5 MI. WEST OF ROUTE 135 · County 027, Massachusetts · Built 1956 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W240171J6MUNNBI
Year Built
1956
Length
6.8 m (22.3 ft)
Max Span
6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$598,000
Total Project Cost
$898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.