ST135 SOUTH ST over WATER ASSABET RIVER

AT WESTBORO TOWN LINE · County 027, Massachusetts · Built 1947 · 2 Lanes · 9,124 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N2000420DDOTNBI
Year Built
1947
Length
21.9 m (71.9 ft)
Max Span
5.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
9,124
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,657,000
Total Project Cost
$2,486,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.