ST 9 TURNPIKE RD over WATER ASSABET RIVER

.3MI. W. OF ST-135 · County 027, Massachusetts · Built 1930 · 5 Lanes · 53,646 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W240021M4DOTNBI
Year Built
1930
Length
13 m (42.7 ft)
Max Span
13 m
Width
28.8 m (94.5 ft)
Lanes
5
Daily Traffic
53,646
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,625,000
Total Project Cost
$3,938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.