ST 41 GRT BARRNGTN over WATER WILLIAMS RIVER

AT INT. W/ COBB ROAD · County 003, Massachusetts · Built 2016 · 2 Lanes · 2,305 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W22004BHDDOTNBI
Year Built
2016
Length
23.5 m (77.1 ft)
Max Span
22.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,305
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,347,000
Total Project Cost
$2,021,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.