I 90 EB over ST183 INTERLAKEN RD
AT MM 5.4 · County 003, Massachusetts · Built 1957 · 2 Lanes · 9,477 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.304253, -73.333847
This bridge is in worse condition than 36% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EB over WATER LARRYWAUG BROOK
Built 1957
I 90 WB over ST183 INTERLAKEN RD
Built 1957
I 90 WB over WATER LARRYWAUG BROOK
Built 1957
ST183 INTERLAKN RD over WATER LARRYWAUG BROOK
Built 2021
HWY AVERIC RD over WATER LARRYWAUG BROOK
Built 2021
HWY PRSPCT HL RD over I 90
Built 1957
ST102 W STCKBRG RD over I 90
Built 1957
HWY GLENDALE MDL over RR HRR
Built 1957
HWY GLENDALE MDL over WATER HOUSATONIC RIVER
Built 1928
HWY GLENDALE MDL over WATER HOUSATONIC RIVER
Built 1978
Bridge Details
- Structure #
- S260134H6DOTNBI
- Year Built
- 1957
- Reconstructed
- 1993
- Length
- 32.4 m (106.3 ft)
- Max Span
- 12.1 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,477
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,936,000
- Total Project Cost
- $4,405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.