ST 41 GRT BARRNGTN over WATER WILLIAMS RIVER

0.3 MI N OF GT BARR TL · County 003, Massachusetts · Built 1931 · 2 Lanes · 4,267 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W220010CGDOTNBI
Year Built
1931
Length
14.9 m (48.9 ft)
Max Span
13.7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,267
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,150,000
Total Project Cost
$1,726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.