HWY I90&I91 CON over HWY PROSPECT AVE
0.2 M S OF HIGHLAND AVE · County 013, Massachusetts · Built 1968 · 4 Lanes · 18,234 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.156556, -72.635328
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 58 years old.
Nearby Bridges
HWY I90&I91 CON over HWY RAMP F TO I90
Built 1968
HWY RP TO I90&91 over US 5 RIVERDALE ST
Built 1953
HWY PROSPECT AVE over HWY RAMPS F/G & H
Built 1968
I 90 WB over I 90 EXIT 45 RAMPS
Built 1957
I 90 EB over I 90 EXIT 45 RAMPS
Built 1957
I 90 over US 5 RIVERDALE ST
Built 1957
I 90 over WATER CONNECTICUT RIVER
Built 1957
I 91 NB over HWY PROSPECT AVE
Built 1967
I 91 NB over I 91 RMP A TPK CONN
Built 1967
I 91 NB over I 90
Built 1967
Bridge Details
- Structure #
- W21040158DOTNBI
- Year Built
- 1968
- Length
- 27.5 m (90.2 ft)
- Max Span
- 25.8 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 4
- Daily Traffic
- 18,234
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,054,000
- Total Project Cost
- $6,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.